Railway and Freelance Photography By Jonathan McGurk
G.A.R.L. (Glasgow Airport Rail Link) Project Photographs
12th December 2008
<-- Back | Showing 37-72 of 88 pictures | Next -->
A view of the new modern L.E.D. signals at night at Glasgow Central High Level station. Some of these signals were installed last year in 2007 during Christmas and New Year and the rest were installed over the festive period this year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. If you look closely you will see that the numbers on the signal I.D. plates are all 4 numbers instead of the usual 3 and all have the letters 'GG'. The signalling upgrade work and also track improvement work between Glasgow Central High Level and Paisley Gilmour Street meant that no train services were allowed in and out of the station for three days which meant a lot of bus replacement services were used. Part of the work being carried out between Friday 26th - Monday 29th December 2008 was renumbering platforms 11 - 13 (including 11a) and numbers 14 and 15 (down in Glasgow Central Low Level station) to platforms 11 - 15 and 16 and 17 which is also part of the G.A.R.L. (Glasgow Airport Rail Link). These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 27/11/08.
A view of the new modern L.E.D. signals at night at Glasgow Central High Level station. Some of these signals were installed last year in 2007 during Christmas and New Year and the rest were installed over the festive period this year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. If you look closely you will see that the numbers on the signal I.D. plates are all 4 numbers instead of the usual 3 and all have the letters 'GG'. The signalling upgrade work and also track improvement work between Glasgow Central High Level and Paisley Gilmour Street meant that no train services were allowed in and out of the station for three days which meant a lot of bus replacement services were used. Part of the work being carried out between Friday 26th - Monday 29th December 2008 was renumbering platforms 11 - 13 (including 11a) and numbers 14 and 15 (down in Glasgow Central Low Level station) to platforms 11 - 15 and 16 and 17 which is also part of the G.A.R.L. (Glasgow Airport Rail Link). These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 27/11/08.
2848x2136
7.JPG
A view of platforms 14 and 15 which were formally known as platforsm 12 and 13. The platforms have been renumbered because two new platforms, platforms 12 and 13 are going to be built next year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. platform 12 has replaced platform 11a which a platform extension from the top of the Network Rail offices down into the station where the station car park currently exists (which the platform extension will replace next year). 27/12/08.
A view of platforms 14 and 15 which were formally known as platforsm 12 and 13. The platforms have been renumbered because two new platforms, platforms 12 and 13 are going to be built next year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. platform 12 has replaced platform 11a which a platform extension from the top of the Network Rail offices down into the station where the station car park currently exists (which the platform extension will replace next year). 27/12/08.
2848x2136
8.JPG
A view looking up to platform 12 (ex platform 11a) from platform 11 at Glasgow Central High Level. To the right hand side is the station car park which, as part of the Glasgow Airport Rail Link (G.A.R.L.) Project, will be closed down and replaced with two new platforms. The new platforms will be numbers 12 and 13. As you can see in the blue sign above in this photograph platform 12 is at the top of the station which now replaces the old platform 11a and this platform will get extended from its current location and straight through down to the station and platform 13 will be a new platform all togather being constructed. Construction work on the extension to platform 12 and for the new platform 13 is due to start early in 2009. 27/12/08.
A view looking up to platform 12 (ex platform 11a) from platform 11 at Glasgow Central High Level. To the right hand side is the station car park which, as part of the Glasgow Airport Rail Link (G.A.R.L.) Project, will be closed down and replaced with two new platforms. The new platforms will be numbers 12 and 13. As you can see in the blue sign above in this photograph platform 12 is at the top of the station which now replaces the old platform 11a and this platform will get extended from its current location and straight through down to the station and platform 13 will be a new platform all togather being constructed. Construction work on the extension to platform 12 and for the new platform 13 is due to start early in 2009. 27/12/08.
2848x2136
9.JPG
A general view of the Glasgow Central High Level station carpark at night. The station car park will be making a complete 'EXIT' (like the sign at the bottom of the photograph) as it will be closing down next year and replaced with the platform 12 (ex platform 11a) extension and a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 27/11/08.
A general view of the Glasgow Central High Level station carpark at night. The station car park will be making a complete 'EXIT' (like the sign at the bottom of the photograph) as it will be closing down next year and replaced with the platform 12 (ex platform 11a) extension and a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 27/11/08.
2848x2136
10.JPG
A general view of the Glasgow Central High Level station carpark at night. The station car park will be making a complete 'EXIT' (like the sign at the bottom of the photograph) as it will be closing down next year and replaced with the platform 12 (ex platform 11a) extension and a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 27/11/08.
A general view of the Glasgow Central High Level station carpark at night. The station car park will be making a complete 'EXIT' (like the sign at the bottom of the photograph) as it will be closing down next year and replaced with the platform 12 (ex platform 11a) extension and a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 27/11/08.
2848x2136
11.JPG
A general view of the exit from Glasgow Central High Level station carpark at night. The station car park will be making a complete 'EXIT' (like the sign at the bottom of the photograph) as it will be closing down next year and replaced with the platform 12 (ex platform 11a) extension and a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 27/11/08.
A general view of the exit from Glasgow Central High Level station carpark at night. The station car park will be making a complete 'EXIT' (like the sign at the bottom of the photograph) as it will be closing down next year and replaced with the platform 12 (ex platform 11a) extension and a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 27/11/08.
2848x2136
12.JPG
A photograph of one of many new L.E.D. controlled signals at Glasgow Central High Level station, 'GG 5811' showing a red colour aspect. This and the rest of the signals at the station are now controlled from the New Network Rail Signalling Centre at Cowlairs. Notice this signal (and the rest of them at the station and straight through to Paisley Gilmour Street) have four numbers. 27/12/08.
A photograph of one of many new L.E.D. controlled signals at Glasgow Central High Level station, 'GG 5811' showing a red colour aspect. This and the rest of the signals at the station are now controlled from the New Network Rail Signalling Centre at Cowlairs. Notice this signal (and the rest of them at the station and straight through to Paisley Gilmour Street) have four numbers. 27/12/08.
2848x2136
13.JPG
A view from the new platform 12 (ex platform 11a) at Glasgow Central High Level station at night looking with a clear, cold and crisp blue sky. Ahead are the new L.E.D. signals that have been fitted over the past two festive periods. These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 27/12/08.
A view from the new platform 12 (ex platform 11a) at Glasgow Central High Level station at night looking with a clear, cold and crisp blue sky. Ahead are the new L.E.D. signals that have been fitted over the past two festive periods. These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 27/12/08.
2848x2136
14.JPG
A view of the new renumbered platform 12 (ex platform 11a) at Glasgow Central High Level station. Platform 12 is going to be extended straight through into the station where it will replace the current station car park which is due to close next year in order for construction work to start taking place on the platform extension and to also build a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. The Network Rail offices  which can be just seen and no more to the left of this photograph are also to closed down and be taken away. 28/12/08.
A view of the new renumbered platform 12 (ex platform 11a) at Glasgow Central High Level station. Platform 12 is going to be extended straight through into the station where it will replace the current station car park which is due to close next year in order for construction work to start taking place on the platform extension and to also build a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. The Network Rail offices which can be just seen and no more to the left of this photograph are also to closed down and be taken away. 28/12/08.
2848x2136
15.JPG
A view of the new renumbered platform 12 (ex platform 11a) at Glasgow Central High Level station. Platform 12 is going to be extended straight through into the station where it will replace the current station car park which is due to close next year in order for construction work to start taking place on the platform extension and to also build a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. The Network Rail offices to the left of this photograph are also to closed down and be taken away. 28/12/08.
A view of the new renumbered platform 12 (ex platform 11a) at Glasgow Central High Level station. Platform 12 is going to be extended straight through into the station where it will replace the current station car park which is due to close next year in order for construction work to start taking place on the platform extension and to also build a new platform 13 as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. The Network Rail offices to the left of this photograph are also to closed down and be taken away. 28/12/08.
2848x2136
16.JPG
A photographs of the buffers at platform 12 (ex platform 11a)
A photographs of the buffers at platform 12 (ex platform 11a)
2848x2136
17.JPG
The new platform 12 sign at Glasgow Central High Level station. This platform now replaces the ex platform 11a. The platform is going to be extended through into the station which will replace the existing car park which is due to be closed down next year in order for the platform and a new platform 13 to be constructed as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 30/12/08.
The new platform 12 sign at Glasgow Central High Level station. This platform now replaces the ex platform 11a. The platform is going to be extended through into the station which will replace the existing car park which is due to be closed down next year in order for the platform and a new platform 13 to be constructed as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 30/12/08.
2848x2136
18.JPG

2848x2136
19.JPG

2848x2136
20.JPG
A photograph of one of many new controlled L.E.D. signals at Glasgow Central High Level station, 'GG 5614'. Work was taking place over the festive period in 2007 and last year in 2008 at the station and surrounding area to upgrade the signalling equipment and signals themselves as well as track improvements as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. All signals now have the 'GG' and four number I.D. plates which are now controlled from the new Network Rail Signalling Centre at Cowlairs. 28/12/08.
A photograph of one of many new controlled L.E.D. signals at Glasgow Central High Level station, 'GG 5614'. Work was taking place over the festive period in 2007 and last year in 2008 at the station and surrounding area to upgrade the signalling equipment and signals themselves as well as track improvements as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. All signals now have the 'GG' and four number I.D. plates which are now controlled from the new Network Rail Signalling Centre at Cowlairs. 28/12/08.
2848x2136
21.JPG
A photograph of two of many new controlled L.E.D. signals at Glasgow Central High Level station, 'GG 5614' and 'GG 5615'. Work was taking place over the festive period in 2007 and last year in 2008 at the station and surrounding area to upgrade the signalling equipment and signals themselves as well as track improvements as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. All signas now have the 'GG' and four number I.D. plates which are now controlled from the new Network Rail Signalling Centre at Cowlairs. 28/12/08.
A photograph of two of many new controlled L.E.D. signals at Glasgow Central High Level station, 'GG 5614' and 'GG 5615'. Work was taking place over the festive period in 2007 and last year in 2008 at the station and surrounding area to upgrade the signalling equipment and signals themselves as well as track improvements as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. All signas now have the 'GG' and four number I.D. plates which are now controlled from the new Network Rail Signalling Centre at Cowlairs. 28/12/08.
2848x2136
22.JPG
A side view of looking down Class 334 017 + 023 as they are seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. Notice the new L.E.D. controlled signals and route letters A - H above the each of the 8 signals fitted to the gantry which were fitted as part of the resignalling and track improvement work over the festive period by Network Rail.  30/12/08.
A side view of looking down Class 334 017 + 023 as they are seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. Notice the new L.E.D. controlled signals and route letters A - H above the each of the 8 signals fitted to the gantry which were fitted as part of the resignalling and track improvement work over the festive period by Network Rail. 30/12/08.
2848x2136
53.JPG
Class 334 018 and a First ScotRail liveried Class 156 Sprinter are both seen coming into Glasgow Central High Level to terminate while passing under the new L.E.D. signals which today caused problems on the Glasgow - Ayr and Inverclyde routes with very limited train services to and from Glasgow Central. Train services to and from Gourock and Wemyss Bay were the services majorly affected by the signalling problems. Notice the new A - B letters that have been put above the 8 controlled singals on the gantry. These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 30/12/08.
Class 334 018 and a First ScotRail liveried Class 156 Sprinter are both seen coming into Glasgow Central High Level to terminate while passing under the new L.E.D. signals which today caused problems on the Glasgow - Ayr and Inverclyde routes with very limited train services to and from Glasgow Central. Train services to and from Gourock and Wemyss Bay were the services majorly affected by the signalling problems. Notice the new A - B letters that have been put above the 8 controlled singals on the gantry. These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 30/12/08.
2848x2136
54.JPG
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
2848x2136
55.JPG
Class 334 018 is seen coming into Glasgow Central High Level to terminate while passing under the new L.E.D. signals which today caused problems on the Glasgow - Ayr and Inverclyde routes with very limited train services to and from Glasgow Central. Train services to and from Gourock and Wemyss Bay were the services majorly affected by the singalling problems. Notice the new A - B letters that have been put above the 8 controlled singals on the gantry. These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 30/12/08.
Class 334 018 is seen coming into Glasgow Central High Level to terminate while passing under the new L.E.D. signals which today caused problems on the Glasgow - Ayr and Inverclyde routes with very limited train services to and from Glasgow Central. Train services to and from Gourock and Wemyss Bay were the services majorly affected by the singalling problems. Notice the new A - B letters that have been put above the 8 controlled singals on the gantry. These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 30/12/08.
2848x2136
56.JPG
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension (includes removing the Network Rail offices where the current platform ends) and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension (includes removing the Network Rail offices where the current platform ends) and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
2848x2136
57.JPG
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension (includes removing the Network Rail offices where the current platform ends) and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension (includes removing the Network Rail offices where the current platform ends) and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
2848x2136
58.JPG
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension (includes removing the Network Rail offices where the current platform ends) and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
A side view of Class 334 017 which is coupled to Class 334 023 while sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station. Platforms 11 - 13 got renumbered over the festive break as part of the G.A.R.L. (Glasgow Airport Rail Link) Project to numbers 11 - 15. Platform 12 is the ex platform 11a and is due to be extended right through the station next year. Platform 13 will be built inside the station. The platform 12 extension (includes removing the Network Rail offices where the current platform ends) and new platform 13 will replace the station car park which is due to be closed down next year so work can be begin on the two platforms being fully constructed. Down below in Glasgow Central Low Level station ex platforms 14 and 15 have been renumbered platforms 16 and 17. Platform 16 is the eastbound platform and platform 17 is the westbound platforms. All the platform have new signs to let the public know what platform they are on. 30/12/08.
2848x2136
59.JPG
Class 334 009 is seen sitting inside platform 14 at Glasgow Central High Level station having just worked the 18.00 1T86 Ardrossan Harbour - Glasgow Central High Level service. Platforms 14 and 15 were formally known as platforms 12 and 13. The platforms have been renumbered because two new platforms, platforms 12 and 13 are going to be built next year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. platform 12 has replaced platform 11a which a platform extension from the top of the Network Rail offices down into the station where the station car park currently exists (which the platform extension will replace next year). 02/01/09.
Class 334 009 is seen sitting inside platform 14 at Glasgow Central High Level station having just worked the 18.00 1T86 Ardrossan Harbour - Glasgow Central High Level service. Platforms 14 and 15 were formally known as platforms 12 and 13. The platforms have been renumbered because two new platforms, platforms 12 and 13 are going to be built next year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. platform 12 has replaced platform 11a which a platform extension from the top of the Network Rail offices down into the station where the station car park currently exists (which the platform extension will replace next year). 02/01/09.
2848x2136
60.JPG
A view of the new modern L.E.D. signals at night at Glasgow Central High Level station. Some of these signals were installed last year in 2007 during Christmas and New Year and the rest were installed over the festive period this year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. If you look closely you will see that the numbers on the signal I.D. plates are all 4 numbers instead of the usual 3 and all have the letters 'GG'. The signalling upgrade work and also track improvement work between Glasgow Central High Level and Paisley Gilmour Street meant that no train services were allowed in and out of the station for three days which meant a lot of bus replacement services were used. Part of the work being carried out between Friday 26th - Monday 29th December 2008 was renumbering platforms 11 - 13 (including 11a) and numbers 14 and 15 (down in Glasgow Central Low Level station) to platforms 11 - 15 and 16 and 17 which is also part of the G.A.R.L. (Glasgow Airport Rail Link). These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 02/01/09.
A view of the new modern L.E.D. signals at night at Glasgow Central High Level station. Some of these signals were installed last year in 2007 during Christmas and New Year and the rest were installed over the festive period this year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. If you look closely you will see that the numbers on the signal I.D. plates are all 4 numbers instead of the usual 3 and all have the letters 'GG'. The signalling upgrade work and also track improvement work between Glasgow Central High Level and Paisley Gilmour Street meant that no train services were allowed in and out of the station for three days which meant a lot of bus replacement services were used. Part of the work being carried out between Friday 26th - Monday 29th December 2008 was renumbering platforms 11 - 13 (including 11a) and numbers 14 and 15 (down in Glasgow Central Low Level station) to platforms 11 - 15 and 16 and 17 which is also part of the G.A.R.L. (Glasgow Airport Rail Link). These signals are now controlled from the new Network Rail Signalling Centre at Cowlairs. 02/01/09.
2848x2136
61.JPG
Class 334 005 + 014 are seen sitting inside platform 15 at Glasgow Central High Level station while waiting to work the 19.00 1K41 Glasgow Central High Level - Ayr service. Platforms 14 and 15 were formally known as platforms 12 and 13. The platforms have been renumbered because two new platforms, platforms 12 and 13 are going to be built next year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. platform 12 has replaced platform 11a which a platform extension from the top of the Network Rail offices down into the station where the station car park currently exists (which the platform extension will replace next year). 02/01/09.
Class 334 005 + 014 are seen sitting inside platform 15 at Glasgow Central High Level station while waiting to work the 19.00 1K41 Glasgow Central High Level - Ayr service. Platforms 14 and 15 were formally known as platforms 12 and 13. The platforms have been renumbered because two new platforms, platforms 12 and 13 are going to be built next year as part of the G.A.R.L. (Glasgow Airport Rail Link) Project. platform 12 has replaced platform 11a which a platform extension from the top of the Network Rail offices down into the station where the station car park currently exists (which the platform extension will replace next year). 02/01/09.
2848x2136
62.JPG
A photograph of the new O.H.L. structure at Cardonald station. 08/01/09.
A photograph of the new O.H.L. structure at Cardonald station. 08/01/09.
2848x2136
63.jpg
Class 334 035 is seen pulling into platform 12 (ex platform 11a) at Glasgow Central High Level station. This paltform is going to be extended straight through into the station replacing the station car park that currently exists on where the platform is going to be extended. The extension to platform 12 is part of the plans for the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
Class 334 035 is seen pulling into platform 12 (ex platform 11a) at Glasgow Central High Level station. This paltform is going to be extended straight through into the station replacing the station car park that currently exists on where the platform is going to be extended. The extension to platform 12 is part of the plans for the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
2848x2136
65.JPG
Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station during a good spell of sunshine while waiting to work another service back out from the station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. Class 334 022 is also seen coming into terminate at the station having just worked the 11.50 1W30 service from Wemyss Bay. 25/02/09.
Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station during a good spell of sunshine while waiting to work another service back out from the station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. Class 334 022 is also seen coming into terminate at the station having just worked the 11.50 1W30 service from Wemyss Bay. 25/02/09.
2848x2136
66.JPG
Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station during a good spell of sunshine while waiting to work another service back out from the station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as wrk on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station during a good spell of sunshine while waiting to work another service back out from the station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as wrk on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
2848x2136
64.JPG
A side view of Class 334 035 looking up platform 12 (ex platform 11a) at Glasgow Central High Level station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
A side view of Class 334 035 looking up platform 12 (ex platform 11a) at Glasgow Central High Level station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
2848x2136
67.JPG
A side view of Class 334 035 which is branding the 'Strathclyde Passenger Transport' text on the side. This photograph is looking up platform 12 (ex platform 11a) at Glasgow Central High Level station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
A side view of Class 334 035 which is branding the 'Strathclyde Passenger Transport' text on the side. This photograph is looking up platform 12 (ex platform 11a) at Glasgow Central High Level station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
2848x2136
68.JPG
A view of Class 334 035 sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station looking through a Network Rail 'Welcome to Glasgow Central' station sign. 25/02/09.
A view of Class 334 035 sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station looking through a Network Rail 'Welcome to Glasgow Central' station sign. 25/02/09.
2848x2136
69.JPG
Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station during a good spell of sunshine while waiting to work another service back out from the station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at Glasgow Central High Level station during a good spell of sunshine while waiting to work another service back out from the station. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
2848x2136
70.JPG
S.P.T. LIVERY GALORE AT GLASGOW CENTRAL HIGH LEVEL STATION!!! : From left to right : Class 334 007 + 014 are seen from the side while coming into platform 14 to terminate the 12.13 2K22 Ayr - Glasgow Central High Level service. Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at the station during a good spell of sunshine while waiting to work another service back out from the station. Class 314 209 is seen departing the station while working the 13.05 2I05 Glasgow Central High Level - Glasgow Central High Level via Maxwell Park Cathcart Circle service. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
S.P.T. LIVERY GALORE AT GLASGOW CENTRAL HIGH LEVEL STATION!!! : From left to right : Class 334 007 + 014 are seen from the side while coming into platform 14 to terminate the 12.13 2K22 Ayr - Glasgow Central High Level service. Class 334 035 is seen sitting inside platform 12 (ex platform 11a) at the station during a good spell of sunshine while waiting to work another service back out from the station. Class 314 209 is seen departing the station while working the 13.05 2I05 Glasgow Central High Level - Glasgow Central High Level via Maxwell Park Cathcart Circle service. The Network Rail offices below the station arch (clearly visible in the photograph) are going to be removed this year as work on extending platform 12 is due to start next month. The work also includes constructing the brand new platform 13, a platform which is non - existant and has not been since December due to the platforms being renumbered from 11 - 15 instead of 11 - previously 13. This construction of the extension and the new platform will be replace the currently (but not for long) station car park. The platform 12 extension and construction of the new platform 13 is part of the G.A.R.L. (Glasgow Airport Rail Link) Project. 25/02/09.
2848x2136
71.JPG
A photograph of the new O.H.L. structure at Paisley Gilmour Street station looking down from teh carpark above and near the station. The O.H.L. equipment has been replaced over the past year or so as part of the G.A.R.L. (Glasgow Airport Rail Link Project). 19/03/09.
A photograph of the new O.H.L. structure at Paisley Gilmour Street station looking down from teh carpark above and near the station. The O.H.L. equipment has been replaced over the past year or so as part of the G.A.R.L. (Glasgow Airport Rail Link Project). 19/03/09.
2848x2136
72.JPG