Class 320 314 is seen calling at platform 2 at Airdrie station while working the 13.38 2H05 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 25/01/07. 1.JPG Buy Print |
Class 334 036 + 026 are seen sitting inside the single platform at Drumgelloch station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 16/04/07. 2.JPG Buy Print |
Class 334 036 + 016 are seen sitting inside the single platform at Drumgelloch station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 23/04/07. 3.JPG Buy Print |
Class 334 015 + 031 are seen sitting inside the single platform at Drumgelloch station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 11/07/07. 4.JPG Buy Print |
A photograph of the buffers at Drumgelloch station which will be removed and replaced with two tracks when the construction work on laying the track and building the Drumgelloch station starts to take place in Spring next year as part of the A - B (Airdrie - Bathgate) Project. 11/07/07. 5.JPG Buy Print |
A photograph of many station signs at the current Drumgelloch station. 17/07/07. 6.JPG Buy Print |
A view looking east towards Bathgate down the single platform at Drumgelloch station which is occupied by Class 334 036 + 001 which arrived into the station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 17/07/07. 7.JPG Buy Print |
Class 334 021 + 001 are seen sitting inside the single platform at Drumgelloch station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 20/07/07. 8.JPG Buy Print |
Class 334 010 + 024 are seen sitting inside the single platform at Drumgelloch station getting ready to work the 18.38 2H39 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 06/08/07. 9.JPG Buy Print |
Class 334 015 + 040 are seen sitting inside the single platform at Drumgelloch station getting ready to work the 18.38 2H39 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 10/08/07. 10.JPG Buy Print |
Class 334 004 + 024 are seen sitting inside the single platform at Drumgelloch station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 28/08/07. 11.JPG Buy Print |
Class 334 024 + 004 are seen sitting inside the single platform at Drumgelloch station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 29/08/07. 12.JPG Buy Print |
Class 334 028 + 020 are seen sitting inside the single platform at Drumgelloch station having just worked the 17.10 2H54 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 19/10/07. 13.JPG Buy Print |
Class 334 007 is seen calling at platform 2 at Airdrie station while working the 12.38 2H01 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 19/12/07. 14.JPG Buy Print |
Class 320 304 is seen sitting inside platform 1 at Airdrie station having just worked the 11.23 2E72 Balloch - Airdrie service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabliing of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 19/12/07. 15.JPG Buy Print |
Class 320 304 is seen sitting inside platform 1 at Airdrie station waiting to work the 12.57 2E53 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabliing of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 19/12/07. 16.JPG Buy Print |
Class 320 317 + 315 are seen sitting stable inside Airdrie C.S. (Carriage Siding). Airdrie station Carriage Sidings which are used thoroughly for the stabliing of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 19/12/08. 17.JPG Buy Print |
Class 320 303 is seen calling at platform 2 at Airdrie station while working the 13.38 2H05 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 06/05/08. 18.JPG Buy Print |
Class 320 306 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.27 2E55 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Sidings which are used thoroughly for the stabliing of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/05/08. 19.JPG Buy Print |
Class 320 306 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.27 2E55 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Sidings which are used thoroughly for the stabliing of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/05/08. 20.JPG Buy Print |
Three side views of three Class 320 Electric Multiple Units at Airdrie station. From left to right, Class 320 306 which is seen sitting inside platform 1 at the station getting prepared to work the 13.27 2E55 Airdrie - Balloch service and Class 320 309 + 317 are seen sitting inside Airdrie C.S waiting to later work the 15.48 5M31 Airdrie - C.S. - Bellgrove E.C.S. wokring in order to then form the 16.08 2M31 Bellgrove - Milngavie service. The Carriage Siding at the station is thoroughly used for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation by December 2010. 06/05/09. 21.JPG Buy Print |
Class 320 306 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.27 2E55 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabliing of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/05/08. 22.JPG Buy Print |
A general view of Airdrie station looking east towards Drumgelloch. On the far left handside is where a new platform will be built and where a new track will be laid as part of the A - B (Airdrie - Bathgate) Project. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/05/08. 23.JPG Buy Print |
Class 320 309 + 317 are seen sitting inside Airdrie C.S waiting to later work the 15.48 5M31 Airdrie - C.S. - Bellgrove E.C.S. wokring in order to then form the 16.08 2M31 Bellgrove - Milngavie service. The Carriage Siding at the station is thoroughly used for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation by December 2010. 06/05/09. 24.JPG Buy Print |
Class 320 306 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.27 2E55 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Sidings which are used thoroughly for the stabliing of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete in December 2010. On the left handside is where a new platform will be built and where a new track will be laid which will also be part of the A - B (Airdrie - Bathgate Project. 06/05/08. 25.JPG Buy Print |
Class 320 314 is seen calling at platform 2 at Drumgelloch station while working the 12.10 2H34 Helensburgh Central - Drumgelloch service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 06/05/08. 26.JPG Buy Print |
Class 334 016 + 025 are seen calling at platform 2 at Airdrie station while working the 16.38 2H55 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 06/06/08. 27.JPG Buy Print |
Class 334 016 + 025 are seen calling at platform 2 at Airdrie station while working the 16.38 2H55 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 06/06/08. 28.JPG Buy Print |
Class 334 022 + 017 are seen sitting inside platform 1 at Airdrie station waiting to work the 16.57 2H89 Airdrie - Helensburgh Central service. On the far left handside is where a new platform will be built and where a new track will be laid as part of the A - B (Airdrie - Bathgate) Project. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/06/08. 29.JPG Buy Print |
Class 334 022 + 017 are seen sitting inside platform 1 at Airdrie station waiting to work the 16.57 2H89 Airdrie - Helensburgh Central service. On the far left handside is where a new platform will be built and where a new track will be laid as part of the A - B (Airdrie - Bathgate) Project. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/06/08. 30.JPG Buy Print |
Class 334 022 + 017 are seen sitting inside platform 1 at Airdrie station waiting to work the 16.57 2H89 Airdrie - Helensburgh Central service. On the far left handside is where a new platform will be built and where a new track will be laid as part of the A - B (Airdrie - Bathgate) Project. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/06/08. 31.JPG Buy Print |
Class 334 022 + 017 are seen sitting inside platform 1 at Airdrie station waiting to work the 16.57 2H89 Airdrie - Helensburgh Central service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 06/06/08. 32.JPG Buy Print |
Class 320 314 is seen sitting inside platform 2 at Airdrie station having just worked the 15.57 2M30 Milngavie - Airdrie service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 06/06/08. 33.JPG Buy Print |
Class 320 314 is seen sitting inside platform 2 at Airdrie station having just worked the 15.57 2M30 Milngavie - Airdrie service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 06/06/08. 34.JPG Buy Print |
A photograph of an Airdrie S.P.T. Rail station sign. 26/11/08. 35.JPG Buy Print |
A photograph of the T.R.T.S. (Train Ready To Start) button for trains departing from platform 1 at Airdrie station. 26/11/08. 36.JPG Buy Print |
A photograph of controlled signal ' YS 155' located on platform 3 at Airdrie station showing a red colour aspect. 26/11/08. 37.JPG Buy Print |
Class 334 003 is seen sitting inside platform 1 at Airdrie station waiting to work the 11.27 2E71 Airdrie - Balloch service. On the left handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 26/11/08. 38.JPG Buy Print |
Class 334 003 is seen sitting inside platform 1 at Airdrie station waiting to work the 11.27 2E71 Airdrie - Balloch service. On the left handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 26/11/08. 39.JPG Buy Print |
Class 320 319 + 305 are seen sitting inside Airdrie C.S waiting to later work the 15.48 5M31 Airdrie - C.S. - Bellgrove E.C.S. wokring in order to then form the 16.08 2M31 Bellgrove - Milngavie service. The Carriage Siding at the station is thoroughly used for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation by December 2010. 26/11/08. 40.JPG Buy Print |
Class 334 003 is seen sitting inside platform 1 at Airdrie station waiting to work the 11.27 2E71 Airdrie - Balloch service. On the left handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 26/11/08. 41.JPG Buy Print |
A view looking east towards Drumgelloch from the top of platform 2/3 at Airdrie station. When December 2010 comes in the calendar, this will be a completely different view. On the left hanside is where the new double track will be laid and lead upto the new Drumgelloch station as part of the A - B (Airdrie - Bathgate) Project which is to be complete by December 2010. 26/11/08. 42.JPG Buy Print |
A view looking east towards Drumgelloch from the top of platform 2/3 at Airdrie station. When December 2010 comes in the calendar, this will be a completely different view. On the left hanside is where the new double track will be laid and lead upto the new Drumgelloch station as part of the A - B (Airdrie - Bathgate) Project which is to be complete by December 2010. 26/11/08. 43.JPG Buy Print |
Class 320 303 is seen approaching and coming into stop at platform 2 at Airdrie station while working the 11.08 2H19 Drumgelloch - Helensburgh Central service. On the left hanside is where the new double track will be laid and lead upto the new Drumgelloch station as part of the A - B (Airdrie - Bathgate) Project which is to be complete by December 2010. 26/11/08. 44.JPG Buy Print |
Class 320 303 is seen calling at platform 2 at Airdrie station while working the 11.08 2H19 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 26/11/08. 45.JPG Buy Print |
A photograph in the snow showing the disused Airdrie Station Signal Box which is seen still fully in tact. This signal box closed in 28th July 1991. Will this still survive during and after the A - B (Airdrie - Bathgate) Project is complete. This is the location of where a new platform will be abuilt and where a new track will be laid as part of the A - B Project. 02/12/08. 46.jpg Buy Print |
A side view of Class 320 303 in the snow which is seen sitting inside platform 1 at Airdrie station waiting to work the 14.27 2E59 Airdrie - Balloch service. On the left handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 02/12/08. 47.jpg Buy Print |
Class 320 303 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 14.27 2E59 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 02/12/08. 48.jpg Buy Print |
A photograph in the snow showing the disused Airdrie Station Signal Box which is seen still fully in tact. This signal box closed in 28th July 1991. Will this still survive during and after the A - B (Airdrie - Bathgate) Project is complete. This is the location of where a new platform will be abuilt and where a new track will be laid as part of the A - B Project. 02/12/08. 49.jpg Buy Print |
A side view of Class 334 028 which is seen sitting inside the single platform at Drumgelloch station. The view is looking east towards the where the new station will be built. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 02/12/08. 50.jpg Buy Print |
Class 334 028 + 031 are seen sitting inside the single platform at Drumgelloch station getting prepared to work the 18.38 2H39 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 02/12/08. 51.jpg Buy Print |
Class 334 008 is seen sitting inside the single platform at Drumgelloch station waiting to work the 15.08 2H11 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 04/12/08. 52.jpg Buy Print |
Class 334 008 is seen sitting inside the single platform at Drumgelloch station waiting to work the 15.08 2H11 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 04/12/08. 53.jpg Buy Print |
A side view of Class 334 003 which is seen sitting inside the single platform at Drumgelloch station as the sun begins to set and getting prepared to work the 15.38 2H13 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. This view was taken looking west towards Airdrie and this will be a different view by the time December 2010 has arrived in the calendar as there will be double track leading upto the new Drumgelloch station when the A - B (Airdrie - Bathgate) Project should be complete. 05/12/08. 54.jpg Buy Print |
Class 334 003 is seen sitting inside the single platform at Drumgelloch station waiting to work the 15.38 2H13 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 05/12/08. 55.jpg Buy Print |
Class 334 003 is seen sitting inside the single platform at Drumgelloch station waiting to work the 15.38 2H13 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 05/12/08. 56.jpg Buy Print |
A view looking west towards Airdrie down the single platform at Drumgelloch station at night which is occupied by Class 320 302 + 314 which had just arrived into the station having just worked the 19.10 2H06 Helensburgh Central - Drumgelloch service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 06/12/08. 57.jpg Buy Print |
Class 320 315 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.27 2E55 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 08/12/08. 58.jpg Buy Print |
Class 320 315 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.27 2E55 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 08/12/08. 59.jpg Buy Print |
A photograph showing the disused Airdrie Station Signal Box which is seen still fully in tact. This signal box closed in 28th July 1991. Will this still survive during and after the A - B (Airdrie - Bathgate) Project is complete. This is the location of where a new platform will be abuilt and where a new track will be laid as part of the A - B Project. 08/12/08. 60.jpg Buy Print |
Class 320 315 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.27 2E55 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 08/12/08. 61.jpg Buy Print |
Class 320 307 is seen sitting inside the single platform at Drumgelloch station getting prepared to work the 13.38 2H05 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. 08/12/08. 62.jpg Buy Print |
A side view of Class 320 307 which is seen sitting inside the single platform at Drumgelloch station getting prepared to work the 13.38 2H05 Drumgelloch - Helensburgh Central service. This station will be closed and demolished and a new station will be built approximately 550 yards east of this location as part of the A - B (Airdrie - Bathgate Project. Construction work for the new Drumgelloch station should start to take place in Spring in 2010. The new station will be a fully un - staffed station and consist of two platforms, self service ticket machines, safe and sheltered waiting areas with 24 hour C.C.T.V. cameras in operation, excellent park and ride facilities with 336 car parking spaces including 18 spaces for those with disabilities. The relocation of what will be the new Drumgelloch station will also see new and improved acccess links to key local roads and facilities. This view was taken looking west towards Airdrie and this will be a different view by the time December 2010 has arrived in the calendar as there will be double track leading upto the new Drumgelloch station when the A - B (Airdrie - Bathgate) Project should be complete. 08/12/08. 63.jpg Buy Print |
Class 320 307 is seen calling at platform 2 at Airdrie station while working the 13.38 2H05 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 08/12/08. 64.jpg Buy Print |
Class 320 307 is seen calling at platform 2 at Airdrie station while working the 13.38 2H05 Drumgelloch - Helensburgh Central service. A new platform will be built and a new track will be laid to the left handside at the station as part of the A - B (Airdrie - Bathgate) Project. 08/12/08. 65.jpg Buy Print |
66.JPG Buy Print |
67.JPG Buy Print |
68.JPG Buy Print |
69.JPG Buy Print |
70.JPG Buy Print |
71.JPG Buy Print |
Class 320 301 is seen sitting inside platform 1 at Airdrie station getting prepared to work the 13.57 2E57 Airdrie - Balloch service. On the right handside is the Airdrie station Carriage Siding which is used thoroughly for the stabling of trains during the day and overnight and will still be used when the A - B (Airdrie - Bathgate) Project is complete and in operation in December 2010. 08/12/08. 72.JPG Buy Print |
| | | |